Final work before the winter set in.
The mill houses the the woodmizer, planer, and tractor. Its a 24' by 16' cantilevered design to hold up the roof using 4 10" posts. .
The forms are in for the foundation. So much work to get to this point using a backhoe. We dug the hole twice since we hit ledge at 5 feet. We removed a rock so big, the initial survey documented it thinking it would never move! You can see it in the lower left of the first picture. 9' by 4' by 5'.
The land has been cleared and the celler hole dug! The footings are finally in and foundation walls ready to be set. Seth and I spent alot of time getting crushed rock inside footings for floor.