Seth and Nick were here all day to help with the logging and milling. A lot of work and two trees including the milling takes a full day. Based upon the yield, I am guessing we need 15 - 18 trees for the equipment shed. Today was a little slow as we had to learn both how to choke logs and use the sawmill.
The pile keeps growing!
June 19th, 2016. Another work day on the pile. We can do about a tree a day between cutting, hauling, and sawing. We are sawing 1 inch boards and 2x8x12' rafters. Nick works for beer and a meal!
October 19, 2016. Have most of the main beams cut. Moving them wet without the tractor is almost impossible. Bigger beams weigh a few hundred pounds each. Hopefully will loose majority of weight when dry.